Wide-angle view of a modern industrial automation factory floor

Case Studies

Discover how leading manufacturers have transformed their operations with our integrated solutions. Real implementations, measurable outcomes, lasting impact.

500+
Successful Implementations
40-70%
Average Time Reduction
3-12
Months ROI
95%+
Customer Satisfaction

Hear directly from our partners

Read testimonials from industry leaders and explore our extensive client portfolio spanning SMED, packaging, and smart factory solutions.

SMED & Quick Mold Change Case Studies

Real customer implementations achieving 40-85% reduction in changeover times through our SMED solutions

Traditional Quick Mold Change Systems

Magnetic clamping solutions achieving 40-70% faster changeovers

Automotive
MATE (Motherson)

MATE (Motherson)

Pondicherry

50% Downtime Reduction at Motherson Automotive

Advanced clamping solution cuts mold change time in half from 30 to 15 minutes on 260T TOSHIBA machine.

Electrical Equipment
Genus Power Infrastructure

Genus Power Infrastructure

Jaipur

55% Downtime Reduction at Genus Power Infrastructure

Quick mold change system transforms 440T Milacron machine efficiency, reducing changeover from 40 to 18 minutes.

Diversified Manufacturing
Godrej & Boyce

Godrej & Boyce

Satara

50% Faster Mold Changes at Godrej & Boyce

Quick change system reduces setup time from 10 to 5 minutes on 400T WINDSOR injection molding machine.

Automotive
Eden Motors

Eden Motors

Pantnagar

40% Reduction in Machine Downtime at Eden Motors

Quick mold change system reduces changeover time from 20 minutes to 12 minutes on 110T NISSEI injection molding machine.

Plastics & Packaging
Sintex BAPL

Sintex BAPL

Sanaswadi, Pune

60% Faster Mold Changes at Sintex BAPL

Revolutionary quick change system reduces setup time from 10 minutes to just 4 minutes on 150T L&T injection molding machine.

Automotive
VOSS Exotech Automotive

VOSS Exotech Automotive

Pune

30-Minute Time Savings at VOSS Exotech Automotive

SMED implementation on 80T ENGEL machine delivers exceptional efficiency gains for automotive supplier.

Packaging
Manjushree Technopack

Manjushree Technopack

Bangalore

69% Faster Mold Changes at Manjushree Technopack

Dramatic reduction in changeover time from 32 minutes to just 10 minutes on 150T Milacron machine.

Advanced SMED Automation Solutions

Complete automation systems achieving sub-minute changeovers

Automotive
DENSO

DENSO

Multiple Global Locations

Sub-50 Second Fully Automated Mold Changes at DENSO

Complete mold change automation achieving less than 50 seconds changeover time with 95%+ machine availability.

Metal Injection Molding
Indo MIM

Indo MIM

India & USA

Comprehensive SMED Solution for Indo MIM

End-to-end mold change automation for the world's largest metal injection molding company, achieving sub-9-minute changeovers.

Smart Factory Intelligence Case Studies

See how our Plast 4.0 IoT monitoring solutions transform reactive operations into proactive, data-driven manufacturing

Food & Beverage

Large Edible Oil Manufacturer

Ahmedabad, India

Real-Time Production Monitoring for Edible Oil Packaging

IoT-based monitoring system reduces operating losses and automates reporting for a large edible oil manufacturer.

Vision Inspection & Quality Control Case Studies

Discover how our automated vision inspection systems achieve 100% quality control at production speeds

Consumer Goods
Gillette

Gillette

Bhiwadi, Rajasthan

100% Quality Inspection for Razor Components

Machine vision system achieves zero-defect quality control for critical plastic components in razor manufacturing.

Ready to Create Your Success Story?

Join hundreds of manufacturers who have transformed their operations with our proven solutions.